City of Brampton Logo

Inspections

Inspections
​​​​​​​​​​​​​​​​​​​​​​​​​​​​​

Building inspections are a critical part of the permitting process. They ensure that construction complies with the Ontario Building Code, zoning by-laws, and other applicable regulations.

Inspections take place between 8am and 4pm daily. The attendee should be on site between 8am and 4pm to conduct your building, plumbing or HVAC inspection on the day scheduled. Contact information must be provided for​ the Attendee. Please ensure the person designated as the attendee is familiar with construction a​nd related terminology for the scope of work requested.

Inspections can only be booked Monday to Friday, excluding statutory holidays. Inspections are available to book for 5 days in advance. At 3pm each day, the next business day will no longer be available for bo​oking on the portal. If you have successfully booked, you will receive an email at the end of the business day confirming the date of your inspection.​​​​ ​​​If your permit has a revision, be sure to schedule the inspection on both the original permit and the revision.

Book an Inspection​​

You can now book inspections through the Brampton Building and Business Portal in two ways:

  • As a Registered User: Log in to your account to view and manage all your permits and inspections
  • As a Guest: Use your Permit Number and Authorization Key​ to book an inspection without creating an account.

If you are scheduling occupancy inspections or final inspections, please book all three disciplines (Building, Plumbing and HVAC) for the same day. If you have any questions or inquiries regarding inspection scheduling or need assistance with booking on the portal, email inspections.scheduling@brampton.ca.

N​​EW: Inspection Recall Fee for ARU Permits

Effective July 21, 2025, a new Inspection Recall Fee applies to Additional Residential Unit (ARU) permits. ARU permits include Two-Unit and Three-Unit Dwellings, as well as Garden Suites.

  • ​If your ARU inspection does not pass on two separate occasions, a fee will be charged for any following inspections​.
  • This policy is intended to encourage inspection readiness and reduce repeat visits.

​​​​For more details, refer to the Inspection Recall FAQ​ or ​download the Inspection Recall Pa​mphlet. ​

Inspection Resources

Mandatory Inspection Checklists​​​​​

When a permit is issued, there is a Mandatory Inspection Checklist included as part of the building permit card. The inspections indicated with a checkmark must be requested for the project. For some residential projects, we will also provide a document to guide you on the order inspections should be booked. You can refer to these documents here:

Further information about inspections are available for the following:

Before You Boo​​​​k

  • Ensure all required work is complete and accessible.
  • Review your permit documents and inspection checklist.
  • Be prepared to select either Building or Fire​ as the inspection type when prompted.

After Yo​​​u Book

  • You will receive a confirmation email with your inspection date and time window.
  • Some inspections (e.g., Start of Construction) may be auto-scheduled 10 days after permit issuance. These will appear in your portal account.​

Check Building Permit & Inspection Status

For help on how to check the status on Brampton Maps​, please see the Check Building Permit Status Instructions.​​​​​​​​​​​​​​​​​​​​​​​​​​​​

Contact Planning, Building and Growth Management

Flower City Community Campus
8850 McLaughlin Road, Unit 1,
Brampton, Ontario L6Y 5T1