LRT Extension Study AboutUpdatesHave Your SayDocuments and Reports Overview Increasing opportunities to travel by rapid transit within the city and surrounding communities is essential for supporting the evolution of Brampton to a sustainable “future ready” city that embraces a high quality of life for all citizens. Light rapid transit investment will play an important role in changing how people get from place A to place B and the transformation of the urban environment. This study is examining and recommending a preferred Main Street alternative to extend light rail transit from Brampton Gateway Terminal to Brampton GO station in Downtown Brampton. Brampton City Council has approved staff recommendations to update the Hurontario-Main LRT environmental assessment study to include three options – the HMLRT approved route, a Main-George one-way loop, and a tunnel – to extend light rail transit from Brampton Gateway Terminal to Brampton GO station in Downtown Brampton. Announcements!Council Update - June 23, 2021Council approved two preferred alignments one surface and one tunnel for the 30% preliminary design and draft environmental project report. !Virtual Open House 2The City has scheduled a second Virtual Open House for the LRT Extension EA Study from April 22 to May 13, 2021!Council Motion - December 12, 2018On December 12, 2018, City Council approved a motion to study a LRT extension on Main Street... Related LinksMetrolinx Hurontario LRTHurontario-Main Street Corridor Secondary PlanTransportation Master Plan 2015Queen Street Transit Master PlanActive Transportation Master PlanBrampton TransitHurontario LRT