ICI and Highrise Residential Inspections

Note: Once you have picked up your permit please review all documents as changes may have been made to the submitted drawings.  If any changes raise concern please review them with your plans examiner.

Along with permit drawings you will a receive permit card and the mandatory inspections, these are discussed in detail below.  On the same card you will find all required reports and certificates to be provided during the construction process. 

If a commitment form is filled out and signed, those professionals have committed to perform general reviews of the construction.  Please review these requirements with your inspectors.  Delays in submitting required documents can result in orders being issued and/or delaying of occupancy and/or closing the permit.   


Are You Ready for Inspection?

Please click on the appropriate category to view the stages at which an inspection should be requested.  Please note that other professionals are required to oversee the construction and provide the necessary reports for review by the inspectors. 

Note: Please ensure that the permit drawings are kept on site at all times during construction and available during inspections.

If you have any questions, please contact your inspector in the specific discipline:  building, plumbing or HVAC inspector between 8 am and 9 am. Inspections take place between 9 am and 4 pm.  Inspection requests can be:

All inspection requests received before 3 pm will be scheduled for next business day.