Previous Updates

​​​​

In 2017, Council directed City staff to undertake a study for two alternative routes on Kennedy Road and McLaughlin Road between the Brampton Gateway Terminal and the Brampton GO Station. In December 2018 and May 2019, Council further directed staff to revise the scope of the LRT Extension EA to update the Hurontario-Main LRT environmental assessment study to include three options – the HMLRT TPAP approved route, a Main-George one-way loop and a tunnel to extend light rail transit from Brampton Gateway Terminal to Brampton GO Station in Downtown Brampton. Rapid transit on Kennedy and McLaughlin Road will be examined further as part of the next update to the Brampton Transportation Master Plan.​
After further evaluation, and completion of the Metrolinx Preliminary Design Business Case (PDBC), two preferred LRT alignment options were determined to be feasible for the Main Street corridor. In June 2021, Council directed staff to prepare the draft 30% preliminary Design and Environmental Project Report (EPR) for both preferred options. ​Brampton Council endorsed the Tunnel Option as the preferred option that best meets needs of the City of Brampton.​

Where we are now...

  • January 24, 2025 the Province announced the funding of the Hazel McCallion LRT Extension Tunnel option to Downtown Brampton.
  • March 21, 2025, the federal government announces support for the Hazel McCallion LRT Extension to Downtown Brampton.
  • Metrolinx has taken over the project and the City is now supporting Metrolinx in their planning and development process. ​
Hazel McCallion Line Downtown Brampton Extension​
​​

Item Status: Current

​Determine Goals and Objectives

Item Status: Current

​Long-List Evaluation

  • Identify Options
  • Sketch Design
  • Evaluate Options
  • Virtual Open House 1 (June 2020)

Item Status: Current

Short-List Evaluation

  • Conceptual Design
  • Evaluate Options
  • Virtual Open House 2 (May 2021)

Item Status: Current

Preferred Options and EPR(TPAP)

  • Preliminary 30% Design
  • Submit Environmental Project Repo​rt (EPR)

Item Status: Current

  • Public Open Ho​use 3
  • Notice of Completion Review Period
  • Minister's Decision​

Project Compl​​etion​​