Abell Drive
Hansen Rd (N) to Hansen Rd (N)
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Adele Court
Duncan Bull Dr to End
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Airport Road Sidewalk
Coventry Rd to Clark Blvd
Ward: 8, 10
Future Construction Project Under Design
Status: In Progress
|
|
|
Apollo Court
Kenilworth Rd to End
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Archdekin Drive
Bramhall Crt to Herkley Dr
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Archdekin Drive
Herkley Dr to Madoc Dr
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Archdekin Drive
Madoc Dr to Rutherford Rd
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Bach Park
At Park
Ward: 4
Park Walkway Improvement
Status: Complete
|
|
|
Banbury Court
Braemar Dr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Barkwood Court
Archdekin Dr to End
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Barkwood Court
Archdekin Dr to Heggie Rd
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Bartley Bull Parkway
40m W of Duncan Bull Dr to 240m N of Roberts Cr
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Basildon Crescent
Brookland Dr to Brookland Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Beatty Avenue
Guest St to Clarence St
Ward: 3
Street Lighting Upgrade
Status: Complete
|
|
|
Beaver Valley Park Bridge
At Park
Ward: 6
Bridge Rehabilitation
Status: Complete
|
|
|
Beechwood Crescent
Braemar Dr to Braemar Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Belfountain Court
Duncan Bull Dr to End
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Bingham Road
Barkwood Crt to Seaborn Rd
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Bishop Court
Basildon Cr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Borden Hill Court
Manorcrest St to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Bovaird Drive
At Torbram Rd
Ward: 7, 9, 10
Intersection Improvement
Status: Region of Peel
|
|
|
Bram West Parkway & Financial Drive
Ward: 6
Class Environmental Assessment
Status: In Progress
|
|
|
Bramalea Road
At Jackson Rd
Ward: 9
Intersection Improvement
Status: Complete
|
|
|
Bramalea Road
Steeles Ave to South City Limits
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Bramalea Road
Queen St to East Dr
Ward: 8
Street Lighting Upgrade
Status: Winter 2011
|
|
|
Bramalea Road
Queen St E to Hwy 407
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Bramhall Circle
Archdekin Dr to End
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Bramhall Court
Archdekin Dr to End
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Brisdale Drive
Sandalwood Pkwy to Bovaird Dr
Ward: 6
Traffic Calming
Status: In Progress
|
|
|
Burnham Crescent
Braemar Dr to Braemar Dr
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Burton Park
At Park
Ward: 5
Park Walkway Improvement
Status: Complete
|
|
|
Calvertdale Road
Layham Gt to End
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Carberry Crescent
Archdekin Dr (N) to Archdekin Dr (S)
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Carleton Park
At Bridge
Ward: 3
Bridge Rehabilitation
Status: Complete
|
|
|
Carleton Park
At Park
Ward: 3
Park Walkway Improvement
Status: Spring 2012
|
|
|
Castlemore Road
Goreway Dr to Airport Rd
Ward: 10
Future Construction Project Under Design
Status: In Progress
|
|
|
Castlemore Road
Hwy 50 to The Gore Rd
Ward: 10
Major Road Construction
Status: Under Construction
|
|
|
Castlemore Road
Clarkway Dr to Hwy 50
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Castlemore Road
Goreway Dr to McVean Dr
Ward: 10
Future Construction Project Under Design
Status: Winter 2011
|
|
|
Catalina Court
Cresswell Dr to End
Ward: 4
Road Resurfacing
Status: Complete
|
|
|
Central Park Drive
Torbram Rd to Glenvale Blvd
Ward: 7, 8
Road Resurfacing
Status: Complete
|
|
|
Central Park Drive
At Glenvale Blvd
Ward: 7, 8
Traffic Signal Upgrade/Installation
Status: Complete
|
|
|
Centre Street North
Williams Pkwy to Claypine Tr
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Charolais Boulevard
Hodgson St to Main St
Ward: 4
Water Works
Status: Region of Peel
|
|
|
Charolais Boulevard
Main St to Mill St
Ward: 4
Road Resurfacing
Status: Complete
|
|
|
Chesham Park
At Park
Ward: 2
Park Walkway Improvement
Status: Spring 2012
|
|
|
Chinguacousy Park Bridge
At Park
Ward: 8
Future Construction Project Under Design
Status: In Progress
|
|
|
Chinguacousy Road
305m S of Steeles Ave to 330m N of Major William Sharpe Dr
Ward: 4, 5, 6
Major Road Construction
Status: Under Construction
|
|
|
Chinguacousy Road
At Burt Dr
Ward: 5
Traffic Signal Upgrade/Installation
Status: Under Construction
|
|
|
Chinguacousy Road
At Major William Sharpe Dr
Ward: 5
Traffic Signal Upgrade/Installation
Status: Winter 2011
|
|
|
Chinguacousy Road
At Dusk Dr
Ward: 6, 4
Traffic Signal Upgrade/Installation
Status: Under Construction
|
|
|
Chinguacousy Road
At Bonnie Braes Dr
Ward: 6, 4
Traffic Signal Upgrade/Installation
Status: Under Construction
|
|
|
Chinguacousy Road
At Exton Rd
Ward: 5, 6
Traffic Signal Upgrade/Installation
Status: Under Construction
|
|
|
Chinguacousy Road
At Valleyway Dr
Ward: 5, 6
Traffic Signal Upgrade/Installation
Status: Under Construction
|
|
|
Chinguacousy Road
At Daviselm Dr
Ward: 5, 6
Traffic Signal Upgrade/Installation
Status: Under Construction
|
|
|
Chipwood Crescent
Archdekin Dr (N) to Archdekin Dr (S)
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Clarence Street
Meadowland Dr to Beatty Ave
Ward: 3
Street Lighting Upgrade
Status: Complete
|
|
|
Clarence Street
Kennedy Rd to Main St S
Ward: 3
Traffic Calming
Status: Complete
|
|
|
Clarence Street Walkway
Clarence St to Wilton Dr
Ward: 3
Street Lighting Upgrade
Status: Complete
|
|
|
Clark Boulevard
Rutherford Rd to Dixie Rd
Ward: 3, 8
Class Environmental Assessment
Status: In Progress
|
|
|
Clark Boulevard
Airport Rd to Devon Rd
Ward: 10
Road Resurfacing
Status: Complete
|
|
|
Clark Boulevard
At Kings Cross Rd
Ward: 8
Traffic Signal Upgrade/Installation
Status: Complete
|
|
|
Clarkway Drive
Castlemore Rd to 600m N of Cottrelle Blvd
Ward: 10
Class Environmental Assessment
Status: EA Complete
|
|
|
Clarkway Drive
Countryside Dr to Castlemore Rd
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Clarkway Drive
N of Bluff Meadow St to N of Castlemore Rd
Ward: 10
Future Construction Project Under Design
Status: In Progress
|
|
|
Clarkway Drive
Cottrelle Blvd to Ebenezer Rd
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Clarkway Drive
At Bellchase Tr
Ward: 10
Traffic Signal Upgrade/Installation
Status: In Progress
|
|
|
Clarkway Drive
At Castle Oaks Crossing
Ward: 10
Traffic Signal Upgrade/Installation
Status: In Progress
|
|
|
Clarkway Drive
At Castlemore Rd
Ward: 10
Traffic Signal Upgrade/Installation
Status: In Progress
|
|
|
Clarkway Drive
Cottrelle Blvd to Castlemore Rd
Ward: 10
Major Road Construction
Status: Under Construction
|
|
|
Clearview Court
Sunforest Dr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Colonel Bertram Road
Mayfield Rd to Dokkum Cr
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Colonel Bertram Road
Conservation Dr to Perth St
Ward: 2
Road Resurfacing
Status: Complete
|
|
|
Conestoga Drive
Sandalwood Pkwy to Bovaird Dr
Ward: 2
Traffic Calming
Status: In Progress
|
|
|
Conservation Drive
Bridge over Etobicoke Creek (W of Kennedy Rd)
Ward: 2
Future Construction Project Under Design
Status: In Progress
|
|
|
Core Crescent
Derwent Ave (N) to Derwent Ave (S)
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Cottrelle Boulevard
Goreway Dr to Humberwest Pkwy
Ward: 10
Class Environmental Assessment
Status: EA Complete
|
|
|
Cottrelle Boulevard
Goreway Dr to Humberwest Pkwy
Ward: 10
Future Construction Project Under Design
Status: In Progress
|
|
|
Cottrelle Boulevard
700m E of McVean Dr
Ward: 10
Major Road Construction
Status: Complete
|
|
|
Cottrelle Boulevard
Hwy 50 to The Gore Rd
Ward: 10
Major Road Construction
Status: Complete
|
|
|
Cottrelle Boulevard
At Thorndale Blvd
Ward: 10
Traffic Signal Upgrade/Installation
Status: Winter 2011
|
|
|
Cottrelle Boulevard
At Clarkway Dr/Via Romano Way
Ward: 10
Traffic Signal Upgrade/Installation
Status: Winter 2011
|
|
|
Cottrelle Boulevard
At Skyvalley Dr/Westbrook Ave
Ward: 10
Traffic Signal Upgrade/Installation
Status: Winter 2011
|
|
|
Cottrelle Boulevard
The Gore Rd to Mid Block
Ward: 10
Major Road Construction
Status: Under Construction
|
|
|
Cottrelle Boulevard
Airport Rd to Humberwest Pkwy
Ward: 10
Major Road Construction
Status: Complete
|
|
|
Countryside Drive
Torbram Rd to Bramalea Rd
Ward: 9
Future Construction Project Under Design
Status: In Progress
|
|
|
Countryside Drive
500m W of Dixie Rd to Bramalea Rd
Ward: 9
Major Road Construction
Status: Complete
|
|
|
Countryside Drive
Goreway Dr to Torbram Rd
Ward: 10
Future Construction Project Under Design
Status: In Progress
|
|
|
Countryside Drive
Dixie Rd to Bramalea Rd
Ward: 9
Water Works
Status: Region of Peel
|
|
|
Countryside Drive
Bramalea Rd to Torbram Rd
Ward: 9
Water Works
Status: Region of Peel
|
|
|
Creditview Road
Steeles Ave W to Queen St W
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Creditview Road
N of Bovaird Dr to S of Fairhill Ave
Ward: 6
Future Construction Project Under Design
Status: In Progress
|
|
|
Creditview Road
Fairhill Ave to Mayfield Rd
Ward: 6
Future Construction Project Under Design
Status: In Progress
|
|
|
Creditview Road
Creditview Rd to Valleyway Dr
Ward: 6
Major Road Construction
Status: Under Construction
|
|
|
Creditview Road
Sandalwood Pkwy to Crown Victoria Dr
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Creditview Road Realignment
James Potter Rd to 1.5km N of Bovaird Dr
Ward: 6
Class Environmental Assessment
Status: EA Complete
|
|
|
Creditview Road Widening
Mayfield Rd to Fairhill Ave
Ward: 6
Class Environmental Assessment
Status: EA Complete
|
|
|
Cresswell Drive
Pearson Rd to Torrance Wds
Ward: 4
Road Resurfacing
Status: Complete
|
|
|
Cupola Court
Greene Dr to End
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Dalraith Crescent
Dorset Dr (S) to Dorset Dr (N)
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Danesbury Crescent
Doncaster Dr to Dorchester Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Danesbury Crescent
Dorchester Dr to Doncaster Dr
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Dartford Road
Balmoral Dr to Doncaster Dr
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Dartnell Place
Dorchester Dr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Davenport Crescent
Drake Blvd to Drake Blvd
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Delemere Road
Drum Oak Cr to Dearbourne Blvd
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Deloraine Drive
Balmoral Dr to Dorchester Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Deloraine Drive
Dorchester Dr to 50m E of Dorchester Dr
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Delta Park Boulevard
Clark Blvd to Queen St
Ward: 10
Road Resurfacing
Status: Complete
|
|
|
Denison Avenue Bridge
At Bridge
Ward: 5
Bridge Rehabilitation
Status: Complete
|
|
|
Derwent Avenue
Cathedral Rd to End
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Devlin Place
Deloraine Dr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Devonshire Drive
Balmoral Dr to Dorchester Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Devonshire Drive
Dorchester Dr to Dearbourne Dr
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Dixie Road
Countryside Dr to Mayfield Rd
Ward: 9
Water Works
Status: Region of Peel
|
|
|
Dokkum Crescent
Colonel Bertram Rd to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Dombey Place
Dorset Dr to End
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Doncaster Drive
Dorchester Dr to Dorset Dr
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Dorchester Drive
Balmoral Dr to Darnell Pl/Duncannon Cr
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Dorset Drive
Dorchester Dr to Dalton Pl/Darlington Cr
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Dowling Crescent
Delemere Rd to Dorchester Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Drake Boulevard
Duke Rd to Balmoral Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Drayton Crescent
Devonshire Dr to Devonshire Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Drayton Crescent
Devonshire Dr (E) to Devonshire Dr (W)
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Drum Oak Crescent
Dowling Cr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Drury Crescent
Duke Rd to Duke Rd
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Duke Road
Deerfield Cr to Dana Crt
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Dumont Court
Drake Blvd to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Dunbarton Crescent
Dorchester Dr to Dorchester Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Dunblaine Crescent
Deloraine Dr to Devlin Pl
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Duncan Bull Drive
Bartley Bull Pkwy (N) to Bartley Bull Pkwy (S)
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Duncannon Crescent
Dorchester Dr to Dorchester Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Dunn Place
Doncaster Dr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Dunn Place
Doncaster Dr to End
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Durham Crescent
Doncaster Dr to Dorset Dr
Ward: 8
Street Lighting Upgrade
Status: Under Construction
|
|
|
Dutch Crescent
Tulip Dr (W) to Tulip Dr (E)
Ward: 4
Road Resurfacing
Status: Complete
|
|
|
Eagleridge Drive
Peter Robertson Blvd to Torbram Rd
Ward: 10
Road Resurfacing
Status: Deferred
|
|
|
Earnscliffe Circle
Earnscliffe Gt to Earnscliffe Gt
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Earnscliffe Gate
Clark Blvd to Earnscliffe Cir
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Eastern Avenue
Kennedy Rd to Trueman St
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Ebenezer Road
The Gore Rd to McVean Dr
Ward: 10
Major Road Construction
Status: Complete
|
|
|
Ebenezer Road
At Via Romano Way
Ward: 10
Traffic Signal Upgrade/Installation
Status: Complete
|
|
|
Ebenezer Road
Thorndale Rd to The Gore Rd
Ward: 10
Major Road Construction
Status: Complete
|
|
|
Edenbrook Hill Drive & Peachleaf Crescent
Ward: 6
Stormwater Management Pond
Status: In Progress
|
|
|
Egret Court
Evalene Crt to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Elmstead Court
Timberlane Dr to End
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Elmstead Court
Timberlane Dr to End
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Epsom Downs Drive
Eringate Rd to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Eringate Road
Balmoral Dr to Epsom Downs Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Esker Lake Trail
At The Franceschini Bridge
Ward: 1, 7, 8
Future Construction Project Under Design
Status: In Progress
|
|
|
Evalene Court
Conestoga Dr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Fairservice Drive
At Countryside Dr
Ward: 9
Water Works
Status: Region of Peel
|
|
|
Fallingdale Crescent
Finchgate Blvd to Finchgate Blvd
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Farmington Drive
Bartley Bull Pkwy to Roberts Cr
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Faversham Court
Fallingdale Cr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Fernbank Road
Folkstone Cr to Finsbury Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Fernbrook Crescent
Kenpark Ave to Fernbrook Cr
Ward: 9
Road Resurfacing
Status: Complete
|
|
|
Ferndale Crescent
Bartley Bull Pkwy to Inglewood Dr
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Fidelia Crescent
Folkstone Cr (N) to Folkstone Cr (S)
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Financial Drive
Steeles Ave W to Casablanca Cir
Ward: 6
Class Environmental Assessment
Status: EA Complete
|
|
|
Financial Drive
Hwy 407 to Steeles Ave W
Ward: 6
Future Construction Project Under Design
Status: In Progress
|
|
|
Finchgate Boulevard
Queen St to Clark Blvd
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Finley Road
West Dr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Finsbury Drive
Folkstone Cr to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
First Gulf Boulevard
Biscayne Cr (S) to Steeles Ave
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Fitzpatrick Drive
Julian Dr to The Gore Rd
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Flamingo Crescent
Forsythia Rd to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Fletchers Creek Boulevard
Bovaird Dr to Williams Pkwy
Ward: 5,6
Traffic Calming
Status: In Progress
|
|
|
Fletchers Creek Boulevard & Porchlight Road
Ward: 5
Stormwater Management Pond
Status: In Progress
|
|
|
Fogal Road
Hwy 50 to The Gore Rd
Ward: 10
Major Road Construction
Status: Complete
|
|
|
Forsythia Road
Flamingo Cr to Folkstone Cr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Fred Kline Park Bridge
At Park
Ward: 5
Future Construction Project Under Design
Status: In Progress
|
|
|
Gable Drive
Sutherland Ave to Reigate Ave
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Gatewood Drive
Greenbriar Rd to Torbram Rd
Ward: 7
Water Works
Status: Region of Peel
|
|
|
George Street North
Railroad St to Queen St
Ward: 5
Road Resurfacing
Status: Deferred
|
|
|
Glebe Crescent
Goldcrest Rd (S) to Goldcrest Rd (N)
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Glenridge Road
Glenforest Rd to Williams Pkwy (E)
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Goldcrest Road
Central Park Dr to Glenvale Blvd
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Golding Avenue
Harper Rd to Nanwood Dr
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Goodwood Road
Goldcrest Rd to Bramalea Rd
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Goreway Drive
Steeles Ave to Brandon Gate Dr
Ward: 10
Class Environmental Assessment
Status: EA Complete
|
|
|
Goreway Drive
Mayfield Rd to Humberwest Pkwy
Ward: 10
Class Environmental Assessment
Status: EA Complete
|
|
|
Goreway Drive
Grade Separation at CN Rail
Ward: 10
Future Construction Project Under Design
Status: In Progress
|
|
|
Goreway Drive
Humberwest Pkwy to Castlemore Rd
Ward: 10
Future Construction Project Under Design
Status: In Progress
|
|
|
Goreway Drive
Mayfield Rd to Countryside Dr
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Granby Court
Greendust Crt to End
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Granby Court
Greendust Crt to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Grassington Court
Gatewood Dr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Grassington Crescent
Greenbriar Rd to Gatewood Dr
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Grassmere Crescent
Glenforest Rd (S) to Glenforest Rd (N)
Ward: 7
Road Resurfacing
Status: Complete
|
|
|
Greendust Court
Greenmount Rd to End
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Greendust Court
Granby Crt to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Greene Drive
Hansen Rd (N) to Hansen Rd (N)
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Gretna Drive
Kimbark Dr to Campbell Dr
Ward: 5
Road Resurfacing
Status: Complete
|
|
|
Guest Street / Mary Street
Main St (S) to Armstrong St
Ward: 3
Street Lighting Upgrade
Status: Complete
|
|
|
Haggert Avenue South
Queen St to Sheard Ave
Ward: 4
Water Works
Status: Region of Peel
|
|
|
Harold Street
McLaughlin Rd to Stanley Crt
Ward: 4
Water Works
Status: Region of Peel
|
|
|
Harper Road
Bartley Bull Pkwy to Cornwall Rd
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Heart Lake Road
At Copperfield Rd
Ward: 2, 9
Major Road Construction
Status: Under Construction
|
|
|
Heggie Road
Barkwood Crt to Seaborn Rd
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Heritage Road
1.5km N of Embleton Rd to 0.7km E of Heritage Rd
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Heritage Road
1.5km N of Embleton Rd to 470m S of Hwy 407
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Heritage Road
Steeles Ave W to 200m N of Steeles Ave W
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Herkley Drive
Rutherford Rd to Archdekin Dr
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Highbush Court
Fernbrook Cr to End
Ward: 2
Road Resurfacing
Status: Complete
|
|
|
Highway 50
Queen St to Castlemore Rd
Ward: 10
Major Road Construction
Status: Region of Peel
|
|
|
Highway 50
Clarkway Dr to Old Castlemore Rd
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Highway 50
Highway 7 to Queen St
Ward: 10
Major Road Construction
Status: Region of Peel
|
|
|
Hillside Drive
Hazelwood Dr to Hillside Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Hillside Drive
Hazelwood Dr to Dixie Rd
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Horwood Drive
McLaughlin Rd to Gretna Dr
Ward: 5
Road Resurfacing
Status: Complete
|
|
|
Humberwest Parkway
Williams Pkwy to Goreway Dr
Ward: 10
Future Construction Project Under Design
Status: In Progress
|
|
|
Humberwest Parkway
Queen St E to North Park Dr
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Humberwest Parkway & Fairlawn Boulevard
Ward: 10
Stormwater Management Pond
Status: In Progress
|
|
|
Hurontario Street
At N of Sandalwood Pkwy (S of Petworth Road)
Ward: 2
Intersection Improvement
Status: Complete
|
|
|
Hurontario Street
Mayfield Rd to Collingwood Dr
Ward: 2
Street Lighting Upgrade
Status: Complete
|
|
|
Hurontario Street
At Highwood Rd/Collingwood Ave
Ward: 2
Major Road Construction
Status: Under Construction
|
|
|
Intermodal Drive
CN Rail Bridge to Airport Rd
Ward: 10
Class Environmental Assessment
Status: In Progress
|
|
|
James Potter Road
At Charolais Blvd
Ward: 6
Traffic Signal Upgrade/Installation
Status: Complete
|
|
|
James Potter Road
Creditview Rd to Williams Pkwy
Ward: 6
Major Road Construction
Status: Under Construction
|
|
|
James Potter Road
Creditview Rd to Ashby Field Rd
Ward: 6
Major Road Construction
Status: Under Construction
|
|
|
James Street/John Street
At James Street/John Street
Ward: 3, 4
Future Construction Project Under Design
Status: In Progress
|
|
|
Jerome Crescent
Jefferson Rd (S) to Jefferson Rd (N)
Ward: 7
Road Resurfacing
Status: Complete
|
|
|
Jersey Avenue
Harper Rd to Benton St
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Julian Drive
Castlemore Rd to Fitzpatrick Dr
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Ken Whillans Drive
Church St E to Nelson St E
Ward: 1
Class Environmental Assessment
Status: In Progress
|
|
|
Kenilworth Road
Madoc Dr to Apollo Crt
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Kennedy Road
At Stafford Dr
Ward: 3
Intersection Improvement
Status: Region of Peel
|
|
|
Kennedy Road
Clarence St to Tullamore Rd
Ward: 3
Street Lighting Upgrade
Status: Complete
|
|
|
Kimbark Drive
Queen St to Gretna Dr
Ward: 5
Road Resurfacing
Status: Complete
|
|
|
Kincaid Court
Primrose Cr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Kindle Court
Elmvale Ave to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Kirkland Road
Abell Dr to Abell Dr
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Lakeridge Drive
Leatherhead Crt to Vodden St
Ward: 7
Road Resurfacing
Status: Deferred
|
|
|
Layham Gate
Main St to Calvertdale Rd
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Leatherhead Court
Lakeridge Dr to End
Ward: 7
Road Resurfacing
Status: Deferred
|
|
|
Lehar Court
Lakeridge Dr to End
Ward: 7
Road Resurfacing
Status: Deferred
|
|
|
Lightwood Place
Laidlaw Ave to End
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Lockton Crescent
Bartley Bull Pkwy to Inglewood Dr
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Lorne Court
Mill St N to End
Ward: 5
Water Works
Status: Region of Peel
|
|
|
Mabel Court
Mayberry Crt to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Macassa Court
Elmvale Ave to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Madoc Drive
Archdekin Dr to Lauderdale Rd
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Madoc Drive
Lauderdale Rd to Sutherland Dr
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Main Street (Züm)
Sandalwood Pkwy to Ray Lawson Blvd
Ward: 1, 2, 3, 4, 5
Intersection Improvement
Status: Under Construction
|
|
|
Main Street Bridge
Main Street (N of Nanwood Dr)
Ward: 3, 4
Future Construction Project Under Design
Status: In Progress
|
|
|
Major Oaks Park
At Park
Ward: 1
Park Walkway Improvement
Status: Complete
|
|
|
Malvern Court
Richmond Dr to End
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Mara Crescent
Ken Whillans Dr (S) to Ken Whillans Dr (N)
Ward: 1
Road Resurfacing
Status: Deferred
|
|
|
Maraboo Court
Elmvale Ave to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Marmora Place
Maitland St to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Mast Drive
Herdmans Rd to End
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Mayberry Court
Mackay St N to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Mayfield Road
Heart Lake Rd to Hurontario St
Ward: 2
Major Road Construction
Status: Region of Peel
|
|
|
Mayfield Road
Stonegate Dr to Kennedy Rd
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Mayfield Road
Dixie Rd to Bramalea Rd
Ward: 9
Major Road Construction
Status: Region of Peel
|
|
|
McLaughlin Road
Steeles Ave to South City Limits
Ward: 4
Class Environmental Assessment
Status: EA Complete
|
|
|
McLaughlin Road
Steeles Ave to South City Limits
Ward: 3, 4
Major Road Construction
Status: Complete
|
|
|
McLaughlin Road
Queen St to 50m S of Brookview Rd
Ward: 5
Road Resurfacing
Status: Deferred
|
|
|
McLaughlin Road
Elgin Dr to Harold St
Ward: 4
Water Works
Status: Region of Peel
|
|
|
McLaughlin Road Bridge
S of Williams Pkwy
Ward: 5
Bridge Rehabilitation
Status: Complete
|
|
|
McLaughlin Road North
Queen St W to Holtby Ave
Ward: 5
Water Works
Status: Region of Peel
|
|
|
McVean Drive
Countryside Dr to Castlemore Rd
Ward: 10
Water Works
Status: Region of Peel
|
|
|
McVean Drive
200m N of Cottrelle Blvd to 200m N of Castlemore Rd
Ward: 10
Major Road Construction
Status: Under Construction
|
|
|
Melville Crescent
Duncan Bull Dr (N) to Duncan Bull Dr (S)
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Merganser Crescent
Havelock Dr (S) to Havelock Dr (N)
Ward: 3
Road Resurfacing
Status: Deferred
|
|
|
Mill Street South
Ambleside Dr to Elizabeth St
Ward: 4
Road Resurfacing
Status: Complete
|
|
|
Mill Street South
Ambleside Dr to Elizabeth St
Ward: 4
Water Works
Status: Region of Peel
|
|
|
Mill Street South
Craig St to Frederick St
Ward: 4
Water Works
Status: Region of Peel
|
|
|
Milner Road
Jersey Ave to Cornwall Rd
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Mississauga Road
Steeles Ave to Hwy 407
Ward: 6
Major Road Construction
Status: Region of Peel
|
|
|
Mississauga Road
Bovaird Dr to Queen St W
Ward: 6
Major Road Construction
Status: Region of Peel
|
|
|
Mississauga Road
Steeles Ave to 1.6km N of Steeles Ave
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Mississauga Road
Ostrander Blvd to 1.5km N of Ostrander Blvd
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Mississauga Road
Queen St W to Embleton Rd
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Mississauga Road
Embleton Rd to 1.2km S of Embleton Rd
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Mississauga Road
Queen St to Ostrander Blvd
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Mississauga Road
Queen St W to Steeles Ave W
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Mississauga Road
Queen St W to Bovaird Dr
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Mississauga Road
Bovaird Dr to Sandalwood Pkwy
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Mono Court
Derwent Ave to End
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Montgomery Square
Monte Vista Tr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Myrtle Court
Mayberry Crt to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Nelson Street West
George St N to Main St
Ward: 5
Road Resurfacing
Status: Deferred
|
|
|
Newlyn Crescent
Linkdale Rd to Linkdale Rd
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Normandy Place
Newcastle Cr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
North Park Drive
Torbram Rd to Bramalea Rd
Ward: 7
Road Resurfacing
Status: Complete
|
|
|
Northwood Drive
Welbeck Dr to 89m W of Welbeck Dr
Ward: 5
Water Works
Status: Region of Peel
|
|
|
Norval Crescent
Farmington Dr to Farmington Dr
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Nymark Place
Nuffield St to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Orenda Road
Bramalea Rd to Creek (W of Victoria Cr)
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Paradise Gardens
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Parkview Place
Peel Village Pkwy to River View Dr
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Parkway Avenue
Kimbark Dr to Gretna Dr
Ward: 5
Road Resurfacing
Status: Deferred
|
|
|
Parr Lake North Park
At Park
Ward: 7
Park Walkway Improvement
Status: Spring 2012
|
|
|
Parthenon Square
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Peaceful Place
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Peggy-Anne Cove
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Pelican Wood
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Pennywood Road
Seaborn Rd to Madoc Dr
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Pennywood Road
Seaborn Rd to Madoc Dr
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Peregrine Grove
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Petal Point
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Piccadilly Place
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Pickerel Ridge
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Pine Tree Crescent
Parkview Pl to Parkview Pl
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Pleasantview Avenue
Vodden St to Rosedale Ave
Ward: 5
Water Works
Status: Region of Peel
|
|
|
Pleaseley Road
Harper Rd to Abbey Rd
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Plover Place
Havelock Dr to End
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Priscilla Court
Philosopher's Tr to End
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Queen Street
Hwy 410 to Centre St
Ward: 1, 3
Class Environmental Assessment
Status: EA Complete
|
|
|
Queen Street
Gateway Blvd to Centre St
Ward: 1, 3, 7, 8
Major Road Construction
Status: Complete
|
|
|
Queen Street (Retaining Walls)
Queen St (W of James St)
Ward: 1, 3
Future Construction Project Under Design
Status: In Progress
|
|
|
Queen Street East
At Airport Rd
Ward: 7, 8, 10
Intersection Improvement
Status: Region of Peel
|
|
|
Queen Street East
Theatre Ln to Etobicoke Creek Bridge
Ward: 1, 3
Street Lighting Upgrade
Status: Complete
|
|
|
Queen Street East
At James St
Ward: 1, 3
Traffic Signal Upgrade/Installation
Status: Winter 2011
|
|
|
Queen Street East / Highway 7
Airport Rd to Hwy 50
Ward: 10
Major Road Construction
Status: Region of Peel
|
|
|
Queen Street West
Creditview Rd to Mississauga Rd
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Queen Street West
McMurchy Ave to McLaughlin Rd
Ward: 4, 5
Road Resurfacing
Status: Region of Peel
|
|
|
Queen Street West
At Chinguacousy Rd
Ward: 4, 5, 6
Intersection Improvement
Status: Region of Peel
|
|
|
Railroad Street
Haggert Ave to McMurchy Ave
Ward: 5
Water Works
Status: Region of Peel
|
|
|
Raine Court
Mara Cr to End
Ward: 1
Road Resurfacing
Status: Deferred
|
|
|
Raine Court
Mara Cr to End
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Rambler Drive
Kennedy Rd to Bartley Bull Pkwy
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Ramsgate Court
Carnforth Dr to End
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Ravenswood Drive
Meadowlark Dr to Timberlane Dr (N)
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Ray Lawson Boulevard
Woodsend Rn to Mavis Rd
Ward: 4
Road Resurfacing
Status: Complete
|
|
|
Redpoll Court
Meadowlark Dr to End
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Redwing Court
Ravenswood Dr to End
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Reeve Road
Moore St to End
Ward: 5
Water Works
Status: Region of Peel
|
|
|
Regentview Drive
Conservation Dr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Rhine Court
Royal Palm Dr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Ridgehill Park
At Park
Ward: 4
Park Walkway Improvement
Status: Complete
|
|
|
Rutherford Road South
Clark Blvd to Orenda Rd
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Sandalwood Park
At Park
Ward: 2
Park Walkway Improvement
Status: Complete
|
|
|
Sandalwood Parkway
Airport Rd to Dixie Rd
Ward: 9, 10
Class Environmental Assessment
Status: EA Complete
|
|
|
Sandalwood Parkway Extension
Creditview Rd to Mississauga Rd
Ward: 6
Class Environmental Assessment
Status: EA Complete
|
|
|
Scenic Gate
Carberry Cr to Herkley Dr
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Seaborn Road
Herkley Dr to Archdekin Dr
Ward: 1
Street Lighting Upgrade
Status: Complete
|
|
|
Seminole Drive
County Court Blvd to Turtlecreek Blvd
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Sifton Place
Hudson Dr to End
Ward: 4
Water Works
Status: Region of Peel
|
|
|
South of Queen Street West
Creditview Rd to Chinguacousy Rd
Ward: 6
Major Road Construction
Status: Under Construction
|
|
|
Staveley Crescent
Bartley Bull Pkwy to Bartley Bull Pkwy
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Steeles Avenue East
At Advance Blvd
Ward: 8
Intersection Improvement
Status: Region of Peel
|
|
|
Steeles Avenue East
Dixie Rd to Airport Rd
Ward: 8
Road Resurfacing
Status: Region of Peel
|
|
|
Steeles Avenue East
At Finch Ave
Ward: 10
Intersection Improvement
Status: Region of Peel
|
|
|
Steeles Avenue East
At Kennedy Rd
Ward: 3
Intersection Improvement
Status: Region of Peel
|
|
|
Steeles Avenue East (Züm)
At West Dr and Rutherford Rd
Ward: 3
Major Road Construction
Status: Under Construction
|
|
|
Steeles Avenue West
Mississauga Rd to Winston Churchill Blvd
Ward: 6
Major Road Construction
Status: Region of Peel
|
|
|
Steeles Avenue West
Winston Churchill Blvd to Mississauga Rd
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Steven Court
Conestoga Dr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Stowe Court
Braidwood Lake Rd to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Terra Cotta Crescent
Bartley Bull Pkwy to Bartley Bull Pkwy
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Thatcher Court
Fanshawe Dr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
The Gore Road
Eastbrook Way to Castlemore Rd
Ward: 10
Major Road Construction
Status: Region of Peel
|
|
|
The Gore Road
Castlemore Rd to 450m N of Castlemore Rd
Ward: 10
Water Works
Status: Region of Peel
|
|
|
The Gore Road
Castlemore Rd to Countryside Dr
Ward: 10
Water Works
Status: Region of Peel
|
|
|
The Gore Road
At Hwy 7
Ward: 10
Intersection Improvement
Status: Region of Peel
|
|
|
The Gore Road
453m N of Castlemore Rd to Countryside Dr
Ward: 10
Water Works
Status: Region of Peel
|
|
|
The Gore Road
Cottrelle Blvd to Castlemore Rd
Ward: 10
Water Works
Status: Region of Peel
|
|
|
Thorntree Crescent
Timberlane Dr (S) to Timberlane Dr (N)
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Torbram Road
Father Tobin Rd to Mayfield Rd
Ward: 9, 10
Class Environmental Assessment
Status: EA Complete
|
|
|
Torbram Road
Queen St to South City Limits
Ward: 8
Class Environmental Assessment
Status: EA Complete
|
|
|
Torbram Road
Grade Separation at South City Limits
Ward: 8
Future Construction Project Under Design
Status: In Progress
|
|
|
Torbram Road
Countryside Dr to Mayfield Rd
Ward: 9, 10
Future Construction Project Under Design
Status: Winter 2012
|
|
|
Torbram Road
Queen St to South City Limit
Ward: 8
Future Construction Project Under Design
Status: Winter 2011
|
|
|
Torbram Road
Clark Blvd to Balmoral Dr
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Townsend Gate
Kennedy Rd to Hansen Rd
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Traverston Court
Somerset Dr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Trueman Street
Trueman St to Trueman St over CN Tracks
Ward: 3
Walkway Improvement
Status: Complete
|
|
|
Tulip Drive
Kingknoll Dr to Windmill Blvd
Ward: 4
Road Resurfacing
Status: Complete
|
|
|
Tullamore Road
Kennedy Rd to Bartley Bull Pkwy
Ward: 3
Street Lighting Upgrade
Status: Under Construction
|
|
|
Turtlecreek Boulevard
County Court Blvd to End
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Turtlecreek Boulevard
Seminole Dr to End
Ward: 3
Water Works
Status: Region of Peel
|
|
|
Valleycreek Drive & Littlewood Gate
Ward: 10
Stormwater Management Pond
Status: In Progress
|
|
|
Victoria Crescent
Orenda Rd to Orenda Rd
Ward: 8
Water Works
Status: Region of Peel
|
|
|
Viewmount Crescent
Rumsey Crt to Colonel Bertram Rd
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Vodden Street West
Isabella St to Pleasantview Ave
Ward: 5
Water Works
Status: Region of Peel
|
|
|
Walker Drive
150m S of Woodslea Rd to Woodslea Rd
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Walker Drive
Torbram Rd to Summerlea Rd
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Wanless Drive
Chinguacousy Rd to Creditview Rd
Ward: 6
Major Road Construction
Status: Under Construction
|
|
|
Wanless Drive
McLaughlin Rd to Chinguacousy Rd
Ward: 6
Major Road Construction
Status: Complete
|
|
|
Wanless Drive
Brisdale Dr to 388m W of Brisdale Dr
Ward: 6
Water Works
Status: Region of Peel
|
|
|
Wanless Drive
At Creditview Rd
Ward: 6
Traffic Signal Upgrade/Installation
Status: Under Construction
|
|
|
Wanless Drive
At Chinguacousy Rd
Ward: 6
Traffic Signal Upgrade/Installation
Status: Under Construction
|
|
|
Wanless Drive
Creditview Rd to Winston Churchill Blvd
Ward: 6
Class Environmental Assessment
Status: In Progress
|
|
|
Waverly Place
Mount Forest Dr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Westchester Park
At Park
Ward: 3
Park Walkway Improvement
Status: Complete
|
|
|
Westcreek Boulevard
At Park
Ward: 3
Bridge Rehabilitation
Status: Complete
|
|
|
Westgate Walk
Campkin St to End
Ward: 4
Road Resurfacing
Status: Complete
|
|
|
Wexford Road
Hurontario St to Conestoga Dr
Ward: 2
Traffic Calming
Status: In Progress
|
|
|
Wexford Road
Conestoga Dr to Kennedy Rd
Ward: 2
Road Resurfacing
Status: Deferred
|
|
|
Williams Parkway
Torbram Rd to Humberwest Pkwy
Ward: 7, 10
Class Environmental Assessment
Status: In Progress
|
|
|
Williams Parkway
McLaughlin Rd to North Park Dr/Howden Blvd
Ward: 1,5,7
Class Environmental Assessment
Status: EA Complete
|
|
|
Williams Parkway
Creditview Rd to Mississauga Rd
Ward: 6
Bridge Rehabilitation
Status: Complete
|
|
|
Williams Parkway
At Hwy 410
Ward: 1, 7
Major Road Construction
Status: MTO
|
|
|
Williams Parkway
Torbram Rd to Chrysler Dr
Ward: 7
Water Works
Status: Region of Peel
|
|
|
Williams Parkway
At Elbern Markell Dr
Ward: 6
Traffic Signal Upgrade/Installation
Status: Complete
|
|
|
Williams Parkway
At Royal West Dr
Ward: 6
Traffic Signal Upgrade/Installation
Status: Complete
|
|
|
Williams Parkway
Valleyway Dr to Bridge
Ward: 6
Major Road Construction
Status: Under Construction
|
|
|
Williams Parkway (Phase 1)
McLaughlin Rd to North Park Dr
Ward: 1,5,7
Future Construction Project Under Design
Status: Winter 2011
|
|
|
Williams Parkway (Phase 2)
McLaughlin Rd to Kennedy Rd
Ward: 1, 5
Future Construction Project Under Design
Status: Winter 2011
|
|
|
Williams Parkway (Phase 3)
Kennedy Rd to North Park Dr
Ward: 1,7
Future Construction Project Under Design
Status: Winter 2011
|
|
|
Willowcrest Court
Stillwater Cr to End
Ward: 5
Water Works
Status: Region of Peel
|
|
|
Windham Place
Mount Forest Dr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Winston Churchill Boulevard
Steeles Ave W to Embleton Rd
Ward: 6
Major Road Construction
Status: Region of Peel
|
|
|
Winterfold Drive
Langston Dr to Rutherford Rd (N)
Ward: 1
Water Works
Status: Region of Peel
|
|
|
Winterfold Park
At Park
Ward: 1
Park Walkway Improvement
Status: Complete
|
|
|
Wishart Place
Monte Vista Tr to End
Ward: 2
Water Works
Status: Region of Peel
|
|
|
Woodside Court
Ravenswood Dr to End
Ward: 3
Road Resurfacing
Status: Complete
|
|
|
Woodslea Road
Walker Dr to Airport Rd
Ward: 8
Road Resurfacing
Status: Complete
|
|
|
Works & Transportation Satellite Yards
North East & South West
Ward: 10
Class Environmental Assessment
Status: In Progress
|
|
|
Worthington Avenue
Fairhill Ave to Bovaird Dr
Ward: 6
Traffic Calming
Status: In Progress
|
|