|
|
|
|
Phase 2
- Phase 2 BRT service (beyond 2013) is extended on Queen St. and Steeles Ave., and added on Bovaird Dr.
- Another 50 to 60 BRT vehicles are added to the system.
- Planning beyond Phase 2 will look at building higher-order rapid transit in the Züm corridors, such as exclusive bus lanes in the centre of the road.
|
|
|
|
|
|