Old Züm


Phase 2 

Zum

Hurontario_Main_st

 

Züm 

Hurontario/Main St. 

 

 

  • Phase 2 BRT service (beyond 2013) is extended on Queen St. and Steeles Ave., and added on Bovaird Dr.
  • Another 50 to 60 BRT vehicles are added to the system.
  • Planning beyond Phase 2 will look at building higher-order rapid transit in the Züm corridors, such as exclusive bus lanes in the centre of the road.
Brampton Transit